EMPLOYMENT | CONTACT US | SITE MAP | LINKS | PRIVACY/LEGAL
- Project Site Map
- Case Studies
- Energy Services
- Energy Improvement
Project
- Hospital Energy
Audit
- RMCS Diagnostic
Services
- Commissioning
- Control System
Master Plan and
Commissioning
- Georgia State
Student Recreation
Center
- Retro-comm.
Poudre High School
- Retro-comm.
JNTF at Schriever
- Georgia Southern
Commissioning
- Facility Design
- Underground Chilled
Water, Sanitary
Sewer and Storm
Sewer
- Stadium Sports
Lighting
- Building Renovation
- HVAC Repair
and DDC Upgrade
- Indoor Air Quality
Services
- LonWorks Based
DDC System
- Bunger Henry
Infrastructure
- Miramar UMCS
- CDC Boiler Plant
Upgrade
- Broward Regional
Hospital Lighting
- Client List
- Discipline Expertise
About EMC Services Markets Served Experience News
HVAC Repair and DDC Upgrade
Design – HVAC Repair and DDC Upgrade
National Hurricane Center, Miami, FL, 1998

EMC provided the National Oceanic and Atmospheric Administration (NOAA) with Architectural/Engineering Services necessary to investigate and report all HVAC and associated control deficiencies at the Weather Forecast Office/National Hurricane Center (WFO/NHC) in Miami, FL.

This project involved a site visit to test, evaluate, operate, and inspect the HVAC installation and provide complete documentation of findings. All system components, including AHUs, condensing units, humidifiers, ductwork, dampers, motors, refrigerant piping systems, etc., were inspected for proper installation and operation.

Calculated heat loads were provided for each room/zone. 
EMC provided calibrated field measurement equipment to verify the performance of the air distribution system.  System air flows and operating temperatures were measured and recorded.

A report was prepared, outlining problems found, adjustments and repairs made, and recommended repairs needed to the system.  The report included calculated equipment heat loads, balancing air flows required for various zones in the building, an evaluation of the existing DDC system, and an evaluation of the sequence of operations.

Preliminary and pre-final design packages for an optimum DDC system were prepared. Bid packages of drawings and specifications suitable for competitive bidding were provided, along with a construction cost estimate.