EMPLOYMENT | CONTACT US | SITE MAP | LINKS | PRIVACY/LEGAL
- Project Site Map
- Case Studies
- Energy Services
- Energy Improvement
Project
- Hospital Energy
Audit
- RMCS Diagnostic
Services
- Commissioning
- Control System
Master Plan and
Commissioning
- Georgia State
Student Recreation
Center
- Retro-comm.
Poudre High School
- Retro-comm.
JNTF at Schriever
- Georgia Southern
Commissioning
- Facility Design
- Underground Chilled
Water, Sanitary
Sewer and Storm
Sewer
- Stadium Sports
Lighting
- Building Renovation
- HVAC Repair
and DDC Upgrade
- Indoor Air Quality
Services
- LonWorks Based
DDC System
- Bunger Henry
Infrastructure
- Miramar UMCS
- CDC Boiler Plant
Upgrade
- Broward Regional
Hospital Lighting
- Client List
- Discipline Expertise
About EMC Services Markets Served Experience News
Georgia State - Student Recreation Center
Commissioning - Georgia State University
Student Recreation Center, Atlanta, GA 1999

EMC is the commissioning agent for the Student Recreation Center at Georgia State University in Atlanta which includes a main and auxiliary gymnasium, a natatorium, administrative offices, specialized activity areas, and support areas. The facility is approximately 162,000 square feet.


EMC is developing and coordinating the execution of a testing plan, verifying good design practice, verifying proper documentation and observing and documenting performance that determines whether systems are functioning in accordance with the documented design intent and in accordance with the contract documents.


The construction commissioning consists of systematically documenting that specified components and systems have been installed and started up properly and then functionally tested to verify and document proper operation through all modes and conditions. In addition, owner-personnel training will be verified and final project operations and maintenance documents will be reviewed for completeness. EMC will also document warranty issues.